Orlando is two electrical cities, and a charger install looks different in each: a capacity check in Lake Nona or Baldwin Park, a harder look at the service in College Park or Conway.
Short garage run on an existing panel with capacity is the low end. Long runs, exterior conduit, subpanels, or a service upgrade push it up.
If you could swap the city name out of this page and it would still be accurate, it should not exist. Here is what actually changes here.
College Park and Delaney Park bungalows still have 60 to 100-amp services in service. A charger is a continuous load on top of that, so the load calculation decides whether load management is enough or the service has to change first.
Plenty of 1960s and 70s ranches out here still have Federal Pacific panels. We will not land a new charger breaker in one without telling you, and the estimate says plainly if the panel is the first job.
Newer construction, often already carrying a pool heater or a second AC on a panel built to the minimum. The question is spare capacity, not the wiring, and a load calculation answers it before we quote.
OUC serves the city core and Duke the outlying areas. Permits go to City of Orlando Permitting Services or Orange County Building Safety depending on your address, and we file to the right one. Incentives change, so ask us what is current for your utility.
Same ranges we publish everywhere, because the work does not cost more just because of the zip code. You get an exact number at the free estimate.
Grant and Victor cover most of the city core. You will have a name and a text before anyone is at your door.
"After getting the run around from other electricians I came across In Phase. Wish I found them first."
"Unlike some of their competitors, they don't try to up-sell products that aren't strictly necessary."
"Our old panel dated back to 1984 and was overdue for replacement. We worked directly with Keylin, who was outstanding from start to finish."
"…tried to over charge for work that was not even necessary. In Phaze offered an alternative option at a fraction of the cost."
Usually not. A load calculation tells us for certain, and load-management devices can often avoid an upgrade entirely. We have talked plenty of people out of a $3,000 upgrade they did not need.
Hardwired is slightly more efficient and tidier; a 14-50 receptacle is more flexible if you change cars. We will tell you which fits your setup.
Most installs are half a day. Long runs or a subpanel can take a full day.
Utility and federal incentives change year to year. Ask us what is current when you call — we track them because our customers ask.
Yes, any listed unit. We are not tied to one brand.
Common. Load management lets two chargers share a circuit intelligently instead of doubling your service.
Free estimate. If you do not need the work, we will tell you — which is why people in Orlando call us back years later.